Hamirpur Bypass NH – 103
Construction of New 2 Lane with Paved Shoulder of Hamirpur Bypass of NH-103 & NH-3 (Design Chainage Km121+175 to Km.138+295, Design Length-17.120 Km) in the State of Himachal Pradesh under NH (O) on HAM

Construction of New 2 Lane with Paved Shoulder of Hamirpur Bypass of NH-103 & NH-3 (Design Chainage Km121+175 to Km.138+295, Design Length-17.120 Km) in the State of Himachal Pradesh under NH (O) on HAM

Four laning of Dhanehari – Lailapur/ Vairengte section ( Package- 2 ) from Existing Chainage km 12 + 920 to km 43 + 000 of NH 306 ( Design Chainage km 20 + 000 to km 49 + 360 ) on Silchar- Vairengte- Sairang road in the State of Assam under Bharatmala Pariyojna on EPC […]

Construction of 4-lane from Barela to Manegaon section of NH-30 from design Ch. 2.900 to design Ch 19.050 (Jabalpur Ring Road) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC mode (Package-1).

Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.8 km).

Construction of additional structures including approaches in vadodara- surat section of nh-48 between existing km. 108+000 to km. 250+000 of nh-48 on epc mode under nh(o) in the state of gujarat